Padma Bridge Details for BCS Preparation - RTNX

The Padma Multipurpose Bridge is a two-level road-rail bridge across the Padma River, the main distributary of the Ganges in Bangladesh. It connects Shariatpur and Madaripur, linking the southwest of the country to the northern and eastern regions. The bridge was inaugurated on 25 June 2022.
Information
Carries: Motor vehicles, Railway
Official name: Padma Multipurpose Bridge
Owner: Bangladesh Bridge Authority
Website: www.padmabridge.gov.bd
Next upstream: Lalon Shah Bridge
Characteristics
Design: Truss bridge
Total length: 6.241 km (20,470 ft)
Width: 18.18 meters(59.6 feet)
Height: 120 meters (394 feet)
Water depth: 122 m (400 ft)
No. of spans: 41
Load limit: 60000 tonnes
No. of lanes: 4
History
Designer: AECOM
Constructed by: China Major Bridge Engineering Co. Ltd.
Construction start: November 26, 2014
Construction end: 23 June 2022
Construction cost: ৳40193.39 crore (US$4.1 billion) (2018 estimates)
Opened: 26 June 2022
Inaugurated: 25 June 2022
Statistics
Toll: Yes